Patman, That would be my worst nightmare! Thankfully I'm sure it isn't though, my tubing is actually 16in. from the perimeter wall.
bbbom, they were dry after further inspection, I had a concrete finisher look at it, he believes it had to do with the excelarator and or lot's of water. It was poured over 6 mil plastic, and actually pushed water up around the edges. He reccomended I sand the whole floor with a 17in. stripper with 20 grit. I can't believe what a work out that was, I have never had arm pump so bad! Of course at 135lbs., the darn machine almost outweighed me. The sanding took the "crust" off the top of the imperfections, though they still exist. I washed it and am letting it dry, then will apply a Sherwin Williams product called "Armorseal 1000 HS". Thanx for the input