I`m thinking about building an FMX ramp, don`t consider that as a challenge, the hard part will be the landing ramp.
Does anyone know how much dirt I will need to make one?.
I`m thinking about maybe 4 truck loads with dirt (each load is 8-10 m3) , anyone have a clue?.
I wont spend 350$ on building a ramp if making a landing ramp is impossible moneywise.. .
remember that you will have to compact the dirt - this will translate to something like a 10-20% loss of volume (depending on type of dirt and how hard you compact)